Sand Removal from Druridge Bay Dunes to be Halted if Highthorn Surface Mine Scheme goes ahead
A long-standing mineral planning permission which allows for the removal of up to 62,000 tonnes of sand from the beach…
A long-standing mineral planning permission which allows for the removal of up to 62,000 tonnes of sand from the beach…